Aero Contractors Compensation: Claim flight delay, cancellation or baggage

Aero Contractors Compensation: Claim flight delay, cancellation or lost baggage. Get up to 600 euros compensation for a delayed or cancelled flight and € 1.414 for lost luggage.

Aero Contractors flight compensation: Eu law and Montreal Convention

Aero Contractors EU Flight compensation: delay, cancellation and overbooking

Aero Contractors European law compensation}

Suitable when any of these two circumstances happen:

  1. if the airline is European or…
  2. if the flight takes off from europe

Compensation outline under Eu law: Aero Contractors delayed, cancelled and overbooked fligh

Table – Aero Contractors flight compensation according to EU Regulation
Flight (km)Aero Contractors CompensationClaim
Less than 1.500 km€ 250Claim € 250
1.500 Km – 3.500 Km€ 400Claim € 400
More than 3.500 Km€ 600Claim € 600

+

Aero Contractors Expenses

+

Aero Contractors damages

Claim Aero Contractors

Aero Contractors E.g compensation according to European 261 law

  • Flight overbooking from Milan to Florence: Less than 1.500 km = 250 euros + expenses.
  • Flight cancellation from Tenrife to Belgium: 1.500 km -3.500 km = 400 euros + expenses.
  • Flight cancellation from Rome to United States: More than 3.500 km = € 600 + expenses.

Aero Contractors Compensations under Montreal Convention for delays, cancellations, overbooked flights and baggage

Aero Contractors delay compensation

Only applicable when these two circumstances happen simultaneously:

  1. All baggage claims even if the airline is european
  2. When it is not an european airline and the flight does not depart from Europe

Delayed flight, cancellation or overbooking compensation table according to the Montreal Convention

Montreal Convention brief: Aero Contractors compensation
CompensationLimit of liabilityExpenses
Luggage€ 5.708 = 4.694 SDR (Special Drawing Rights)Other flighs, rents, tours, other missed flights

Claim Aero Contractors flight according to the Montreal Convention

Aero Contractors lost baggage or delayed luggage compensation


Reclaim lost baggage Aero Contractors

If you Claim Aero Contractors for baggage delay you can get a compensation of 1.414 euros + expenses.

Summary: Aero Contractors lost baggage compensation according to the Montreal Convention
Baggage claimLimit of liabilityExpenses
Lost or damaged1.414 euros = 1.253 SDR (Special Drawing Rights)Clothes, cost of the baggage, taxis

Claim Aero Contractors luggage

Read: Fill the PIR: Property Irregularity Report to claim for the baggage to Aero Contractors

Property irregularity report Aero Contractors

What is Aero Contractors PIR?

The Aero Contractors Property Irregularity Report (PIR) number is a unique code that tracks your delayed or damaged suitcase. You can find 10 letters and numbers and it is necessary to claim to Aero Contractors.

  • Number of lost baggages
  • Type of disruption
  • Reference code so that Aero Contractors can trace the suitcase
  • Flight code
  • Date
  • Colour and type
  • Name

Read about Aero Contractors cancellations

Aero Contractors cancelled flights notified more than 14 days before date of departure:

Mario has received a text from Aero Contractors telling him that his flight in 18 days is cancelled. He does not have a right to compensation under the Regulation but may seek a refund of his flight cost. If there is not proof of text from Aero Contractors he will be entitled to a compensation too.

Aero Contractors cancellations notified between seven and fourteen days before date of departure:

John has received a text from Aero Contractors telling him that his flight in 10 days is cancelled. He has a right to compensation as his flight was cancelled by Aero Contractors between 7 and 14 days before his departure and his flight departs more than two hours before the original scheduled time of departure and arrives more than four hours after the original scheduled arrival time.

Aero Contractors cancelled flight notified less than 7 days before departure:

Sam has received a text from Aero Contractors notifying him that his flight in two days is cancelled. He has a right to compensation as his flight was cancelled by Aero Contractors less than seven days before his departure and the new flight departs more than one hour before the {original} time of departure and arrives more than two hours after the original scheduled time.

Aero Contractors “no show” booking clauses

“No show” is ilegal. You can claim a compensation if you are being denied from boarding.

Can I claim my delayed flight directly to Aero Contractors?

First of all, if you want to claim directly to Aero Contractors, you have to know your chances are scarce, since very often Aero Contractors tries to justify their flight delays with extraordinary circumstances that didn’t really happen, like bad weather. Consequently, it is advised to direct your claim through lexority.

Claim Aero Contractors

Time limit: How far back can I claim a flight compensation to Aero Contractors?

Time Limit: 2 to 5 years as a general rule, depending on the type of regulation that applies in that particular case.

  • Montreal Convention: 2 years
  • UE Regulation: 2 to 10 years. It is necessary to the civil code for each country.

Documentation to claim correctly to Aero Contractors:

Reservation

flight delayed claim Aero Contractors

Boarding pass

cancellation claim Aero Contractors

ID or pass

luggage flight claim Aero Contractors

Receipts

denied boarding claim Aero Contractors

Some Tips to claim Aero Contractors

Ask the reason why Aero Contractors flight got delayed or cancelled

The cause of the delayed flight is critical: principally if you have thrown away the boarding pass.

Aero Contractors flight delays: 3 or more hours

Aero Contractors delay must be higher than 3 hours to be granted a compensation.

Claim Aero Contractors

Overbooking at Aero Contractors flight

Overbooked Aero Contractors flight: When Aero Contractors sells more tickets than the actual number of people they can take.

The overbooking is legal, but you can be granted up to € 600.

Aero Contractors aims to avoid empty seats due to no-shows, and this must be legally sanctioned.

Once a Aero Contractors passenger has received a reservation or any document stating the payment has been accepted and registered, it is a “confirmed reservation”. Boarding denials happen when a passenger presents to the gate but Aero Contractors refuses them access to the plane.

Find out the Distance between airports to calculate Aero Contractors compensation

Aero Contractors flight distance
In the first place, keep in mind that which is measured is the Aero Contractors origin and the final destination of the reservation. For this reason, if we have a stop, you do not have count it. The orthodromic distance (bird flight) between origin and final destination has to be measured.

In this website: Distance from you can exactly calculate the kilometers from airport to airport.